File #: 15-0110    Version: 1 Name: Path Construction, Arlington Heights, Illinois
Type: Bid Recommendation Status: Approved
File created: 12/29/2014 In control: Finance Committee
On agenda: 1/20/2015 Final action: 1/20/2015
Title: PROPOSED BID RECOMMENDATION Presented by: ARNOLD RANDALL, GENERAL SUPERINTENDENT Department: Planning and Development Request: Authorization for the Forest Preserve District of Cook County (the "Forest Preserves") to enter into a contract with Path Construction, Arlington Heights, Illinois, recreation landscape improvements at Swallow Cliff-north near Palos Park including construction of new stairs on the west side of the sledding hill, repair and regarding of the existing sledding hill and related site improvements Reason: Contract 13-80-02-16C2; Swallow Cliff Site Improvements. The work includes, but is not limited to, site grading, concrete paving, cast-in-place concrete, concrete stair steps, limestone stair steps, railing, drainage piping, landscape restoration, and other related work as specified in the plans & specifications Bid Opening Date: 12/10/2014 Bid Results: Firm Base Bid Additional Work Item's #1* Total Bid 1. Path Construction ...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent
title
PROPOSED BID RECOMMENDATION
 
Presented by: ARNOLD RANDALL, GENERAL SUPERINTENDENT
 
Department:  Planning and Development   
 
Request:  Authorization for the Forest Preserve District of Cook County (the "Forest Preserves") to enter into a contract with Path Construction, Arlington Heights, Illinois, recreation landscape improvements at Swallow Cliff-north near Palos Park including construction of  new stairs on the west side of the sledding hill, repair and regarding  of the existing sledding hill and related site improvements
 
Reason:   Contract 13-80-02-16C2; Swallow Cliff Site Improvements.  The work includes, but is not limited to, site grading, concrete paving, cast-in-place concrete, concrete stair steps, limestone stair steps, railing, drainage piping, landscape restoration, and other related work as specified in the plans & specifications
 
Bid Opening Date:  12/10/2014
 
Bid Results:
Firm                              Base Bid       Additional Work Item's #1*       Total Bid
1.  Path Construction                  $739,400.00            $19,476.00            $758,876.00
2.  Schaefges Brothers                  $774,989.68            $24,272.00            $799,261.68
3.  Chicago Commercial Construction      $813,798.67            $27393.63            $841,192.30
4.  Old Veteran Construction            $868,257.76            $81,304.60            $949,562.36
5.  All-Bry                        $869,960.01            $17,970.00            $887,930.01
6.  Speedy Gonzalez                  $927,100.00            $24,844.00            $951,944.00
7.  Industria                        $989,695.00            $21,370.00            $1,011,065.00
*New warming shelter landscape.
 
Estimated Fiscal Impact: $758,876.00
 
Contract Period:  Two Hundred and Forty (240) days from notice to proceed
 
Account Name/Number:  Recreation Landscape Accounts 25-6760, 51-6760, 52-6760, 54-6760 & 55-6760
 
District: 17  
 
Concurrence(s):
The vendor has met the Minority and Women Business Enterprise Ordinance provision.
The Chief Attorney and Chief Financial Officer have approved this item.