File #: 14-0339    Version: 1 Name: Path Construction Company Inc., Arlington Heights, Illinois
Type: Bid Recommendation Status: Approved
File created: 7/1/2014 In control: Finance Committee
On agenda: 7/22/2014 Final action: 7/22/2014
Title: PROPOSED BID RECOMMENDATION Presented by: ARNOLD L. RANDALL, General Superintendent Department: Planning and Development Request: requesting authorization for the Forest Preserves of Cook County (the "Preserves") to enter into a contract with Path Construction Company Inc., Arlington Heights, Illinois, for reconstruction of Camp Dan Beard near Northbrook, Illinois. Reason: Contract 13-80-03-008-C is for the reconstruction of Camp Dan Beard. The reconstruction of the camp ground includes, but is not limited to, construction of year-round cabins, small cabins, a toilet/shower building, picnic shelter and redevelopment of an existing cabin known as the Baity cabin. The project also includes landscaping, development of trails/paths, site furnishings, utilities, site development, parking, signage and other related work as specified in the plans and specifications. Bid Opening Date: 6/25/2014 Bid Results: Firm Base Bid Recommended Deduct Alternate Bid 1...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent
title
PROPOSED BID RECOMMENDATION
 
Presented by: ARNOLD L. RANDALL, General Superintendent
 
Department:  Planning and Development
 
Request:  requesting authorization for the Forest Preserves of Cook County (the "Preserves") to enter into a contract with Path Construction Company Inc., Arlington Heights, Illinois, for reconstruction of Camp Dan Beard near Northbrook, Illinois.   
 
Reason:   Contract 13-80-03-008-C is for the reconstruction of Camp Dan Beard.  The reconstruction of the camp ground includes, but is not limited to, construction of  year-round cabins, small cabins, a toilet/shower building, picnic shelter and redevelopment of an existing cabin known as the Baity cabin. The project also includes landscaping, development of trails/paths, site furnishings, utilities, site development, parking, signage and other related work as specified in the plans and specifications.
 
 
Bid Opening Date:  6/25/2014
 
Bid Results:
Firm                              Base Bid            Recommended Deduct Alternate Bid
1.  Path Construction Co. Inc.            $2,094,200.00                        $2,061,200.00
2.  Cornerstone Contracting            $2,423,000.00                        $2,405,000.00
3.  Mack Construction                  $2,446,000.00                        $2,417,000.00
4.  Oakley Construction                  $2,725,031.00                        $2,670,000.00
 
Base bid amounts included line item costs for standing seam metal roofing for all structures.  The bid recommendation is to award the contract with deduct alternate #1-Furnish and install Asphalt Shingles in lieu of Standing Seam Metal Roof Panels at  toilet/shower Building, 2 bedroom cabins, small cabins, and shelter.   
 
Estimated Fiscal Impact: $2,061,200.00
 
Contract Period:  Three hundred and fifty (350) days from notice to proceed.
 
Account Name/Number:  Camp Accounts, 25-6730, 51-6730, 52-6730, 54-6730
 
District: 14  
 
Concurrence(s):
The vendor has met the Minority and Women Business Enterprise Ordinance provision.
The Comptroller and Chief Attorney have approved this item.