File #: 14-0197    Version: 1 Name: J&R 1st in Asphalt, Inc., Hickory Hills, Illinois
Type: Bid Recommendation Status: Approved
File created: 3/18/2014 In control: Finance Committee
On agenda: 4/8/2014 Final action: 4/8/2014
Title: PROPOSED BID RECOMMENDATION Request: requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with J&R 1st in Asphalt, Inc., Hickory Hills, Illinois. Reason: Contract 13-80-02-07C1 is for resurfacing the parking lot and the runway at Schiller Model Airplane Flying Field. Work includes, but is not limited to, asphalt pavement repairs to existing parking lot, reconfiguration and restriping of the asphalt parking lot, an asphalt pavement model airplane runway, an ADA asphalt pavement walk from the runway to the parking lot, site grading with seeding and hydromulch, and other related work as specified in the plans & specifications. Bid Opening Date: 2/26/2014 Bid Results: 1. Robe, Inc. $147,027.78* 2. J&R 1st in Asphalt, Inc. $179,875.41 3. Elanar Construction $202,117.10 4. RNR Contractors $210,052.80 5. Century Contractors $243,409.50 * The Compliance Administrator deemed ...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent
title
PROPOSED BID RECOMMENDATION
 
Request:  requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with J&R 1st in Asphalt, Inc., Hickory Hills, Illinois.  
 
Reason:   Contract 13-80-02-07C1 is for resurfacing the parking lot and the runway at Schiller Model Airplane Flying Field. Work includes, but is not limited to, asphalt pavement repairs to existing parking lot, reconfiguration and restriping of the asphalt parking lot, an asphalt pavement model airplane runway, an ADA asphalt pavement walk from the runway to the parking lot, site grading with seeding and hydromulch, and other related work as specified in the plans & specifications.
 
Bid Opening Date:  2/26/2014
 
Bid Results:
1.  Robe, Inc.                                          $147,027.78*
2.  J&R 1st in Asphalt, Inc.                              $179,875.41
3.  Elanar Construction                                    $202,117.10
4.  RNR Contractors                                    $210,052.80
5.  Century Contractors                                    $243,409.50
 
* The Compliance Administrator deemed Robe, Inc. as non-responsive bidder for lack of MBE/WBE participation
 
Estimated Fiscal Impact: $179,875.41
 
Contract Period:  5 months from notice to proceed.
 
Account(s):  Recreation (Landscape Improvements) , 25-6760, 51-6760, 52-6760 and 54-6760
 
District(s): 9  
 
Concurrence(s):
The vendor has met the Minority and Women Business Enterprise Ordinance provision.
The Chief Attorney and Chief Financial Officer have approved this item.
The vendor is in good standing with the State of Illinois.