File #: 14-0196    Version: 1 Name: Conservation Land Stewardship, Inc
Type: Bid Recommendation Status: Approved
File created: 3/18/2014 In control: Finance Committee
On agenda: 4/8/2014 Final action: 4/8/2014
Title: PROPOSED BID RECOMMENDATION Request: requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with Conservation Land Stewardship, Inc., Elmhurst, Illinois. Reason: Contract 13-80-02-01C2 is for shoreline stabilization at River Trail Nature Center. Work includes cutting and removal of existing sheet pile, construction of limestone slab rock ledge, earth excavation, topsoil seeding and erosion control blanket, storm sewer maintenance and other related work as specified in the plans & specifications. Bid Opening Date: 2/26/2014 Bid Results: 1. Conservation Land Stewardship $154,329.02 2. Elanar Construction $179,780.00 3. Industria $209,745.00 4. Hyde Park $234,935.00 5. Pan Oceanic Engineering Co., Inc. $278,600.00 6. Robe, Inc. $637,286.95 Estimated Fiscal Impact: $154,329.02 Contract Period: 5 months from notice to proceed. Account Name/Number: Restoration ...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent
title
PROPOSED BID RECOMMENDATION
 
Request:  requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with Conservation Land Stewardship, Inc., Elmhurst, Illinois.  
 
Reason:   Contract 13-80-02-01C2 is for shoreline stabilization at River Trail Nature Center. Work includes cutting and removal of existing sheet pile, construction of limestone slab rock ledge, earth excavation, topsoil seeding and erosion control blanket, storm sewer maintenance and other related work as specified in the plans & specifications.
 
Bid Opening Date:  2/26/2014
 
Bid Results:
1.  Conservation Land Stewardship                        $154,329.02
2.  Elanar Construction                                    $179,780.00
3.  Industria                                          $209,745.00
4.  Hyde Park                                          $234,935.00
5.  Pan Oceanic Engineering Co., Inc.                        $278,600.00
6.  Robe, Inc.                                          $637,286.95
 
Estimated Fiscal Impact: $154,329.02
 
Contract Period:  5 months from notice to proceed.
 
Account Name/Number:  Restoration (Landscape) Accounts 25-6750, 51-6750, 52-6750 and 54-6750
 
District(s): 17
 
Concurrence(s):
The vendor has met the Minority and Women Business Enterprise Ordinance provision.
The Chief Attorney and Chief Financial Officer have approved this item.
The vendor is in good standing with the State of Illinois.