Skip to main content
File #: 14-0231    Version: 1 Name: Old Veteran Construction., Chicago, Illinois for Camp Reinberg
Type: Bid Recommendation Status: Approved
File created: 4/29/2014 In control: Finance Committee
On agenda: 5/20/2014 Final action: 5/20/2014
Title: PROPOSED BID RECOMMENDATION Request: requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with Old Veterans Construction., Chicago, Illinois. Reason: Contract 13-80-03-004-C is for the Camp Reinberg Development. The proposed project is the redevelopment and new construction of the existing Camp Reinberg. Work includes, but is not limited to, the renovation of the existing dining hall, construction of new small cabins, new 2 bedroom cabins, development of tent sites, new toilet/shower building, new picnic/program shelter, storage building, landscaping, development of trails/paths, site furnishings, utilities, site development, parking, signage and other related work as specified in the plans & specifications. Bid Opening Date: 4/25/2014 Bid Results: Firm Base Bid Recommended Deduct Alternate Bid 1. Old Veterans Construction $3,999,843.76 $3,920,843.76 2. Wight Construction $4,250,000.00 $4,1...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent
title
PROPOSED BID RECOMMENDATION
 
Request:  requesting authorization for the Forest Preserve District of Cook County (the "Preserves") to enter into a contract with Old Veterans Construction., Chicago, Illinois.  
 
Reason:   Contract 13-80-03-004-C is for the Camp Reinberg Development.  The proposed project is the redevelopment and new construction of the existing Camp Reinberg.  Work includes, but is not limited to, the renovation of the existing dining hall, construction of new small cabins, new 2 bedroom cabins, development of tent sites, new toilet/shower building, new picnic/program shelter, storage building, landscaping, development of trails/paths, site furnishings, utilities, site development, parking, signage and other related work as specified in the plans & specifications.
 
Bid Opening Date:  4/25/2014
Bid Results:
Firm                              Base Bid            Recommended Deduct Alternate Bid
1.  Old Veterans Construction            $3,999,843.76            $3,920,843.76
2.  Wight Construction                  $4,250,000.00            $4,190,000.00
 
Base bid amounts include costs for standing seam metal roofs on the new structures. Deduct alternate bids were requested in the Bid Documents and represent the costs for the construction of asphalt shingle roofs  in lieu of the standing seam metal roof panels at the toilet/shower building, 2 bedroom cabins, small cabins, shelter and storage building.
 
Estimated Fiscal Impact: $3,920,843.76
 
Contract Period:  Nine (9) months from notice to proceed.
 
Account(s): Camp Development 25-6730, 51-6730, 52-6730, 54-6730
 
District(s): 14  
 
Concurrence(s):
The vendor has met the Minority and Women Business Enterprise Ordinance provision.
The Chief Attorney and Chief Financial Officer have approved this item.