Legislation Details

File #: 26-0375    Version: 1 Name:
Type: Intergovernmental Agreement Status: Agenda Ready
File created: 8/19/2026 In control: FPD Board of Commissioners
On agenda: 10/20/2026 Final action:
Title: PROPOSED INTERGOVERNMENTAL AGREEMENT Department: Department of Planning and Development Other Part(ies): Illinois Department of Transportation (“IDOT”) Request: Authorization for the Forest Preserves of Cook County (the "Forest Preserves") to enter into an Intergovernmental Agreement (“IGA”) regarding infrastructure repairs Goods or Services: The Forest Preserves and IDOT would like to cooperate in the planning, design, construction and maintenance of emergency repair of a culvert headwall and other infrastructure in the Harlem Avenue right-of-way (“ROW”) at Tinley Creek. Agreement Number(s): #26-0375 Agreement Period: 10/20/2026 – 10/19/2031 Fiscal Impact: Not to Exceed $300,000.00 ($250,000.00 estimate plus 20% contingency) to be fully reimbursed by IDOT Accounts: Land Improvements 51010.560060 Grant Accounts District(s): 17 Summary: While inspecting portions of the Forest Preserves’ Tinley Creek Trail at Harlem Avenue, Forest Preserves staff discovered ...
Indexes: ADAM BIANCHI, General Superintendent
Attachments: 1. Tinley Creek Trail Maps, 2. LOI FPCC-IDOT Cost Sharing_IL-43 at Tinley Creek
Related files: 26-0309
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
PROPOSED INTERGOVERNMENTAL AGREEMENT

Department: Department of Planning and Development

Other Part(ies): Illinois Department of Transportation (“IDOT”)

Request: Authorization for the Forest Preserves of Cook County (the "Forest Preserves") to enter into an Intergovernmental Agreement (“IGA”) regarding infrastructure repairs

Goods or Services: The Forest Preserves and IDOT would like to cooperate in the planning, design, construction and maintenance of emergency repair of a culvert headwall and other infrastructure in the Harlem Avenue right-of-way (“ROW”) at Tinley Creek.

Agreement Number(s): #26-0375

Agreement Period: 10/20/2026 – 10/19/2031

Fiscal Impact: Not to Exceed $300,000.00 ($250,000.00 estimate plus 20% contingency) to be fully reimbursed by IDOT

Accounts: Land Improvements 51010.560060 Grant Accounts

District(s): 17

Summary: While inspecting portions of the Forest Preserves’ Tinley Creek Trail at Harlem Avenue, Forest Preserves staff discovered a severely deteriorated culvert headwall in the Harlem Avenue ROW. Forest Preserves staff have requested that IDOT financially participate in the culvert headwall replacement and other work including, but not limited to, concrete repairs in the trail tunnel under Harlem Avenue, streambank stabilization, catch basin replacement, landscaping and pedestrian resurfacing and related repairs within the Harlem Ave (IL 43) ROW at Tinley Creek (south of 143rd Street). IDOT has agreed to participate in the construction costs associated with these improvements as outlined in a letter between the parties dated July 31, 2026, which will be attached as an exhibit to the IGA.

The Forest Preserves will agree to act as the lead agency in performing the engineering and construction work and will obtain all applicable permits associated with the improvements. The improvements will be included as part of the Forest Preserves’ trail resurfacing and streambank stabilization project. Upon completi...

Click here for full text