File #: 16-0267    Version: 1 Name: GMA Construction Group, Chicago, Illinois
Type: Bid Recommendation Status: Approved
File created: 6/7/2016 In control: Finance Committee
On agenda: 9/13/2016 Final action: 9/13/2016
Title: PROPOSED BID RECOMMENDATION Department: Planning and Development Request: Authorization for the Forest Preserves District of Cook County (the "Preserves") to enter into a construction contract with GMA Construction Group, Chicago, Illinois to furnish and install water filtration systems at Camp Bullfrog located in Palos Township, Maple Lake Boathouse located in Palos Township, Swallow Cliff Warming Center located in Palos Township, and Camp Shabbona located in Thornton Township. Reason: 16-80-43-R Water Filtration Systems - Rebid. Work undertaken by this contract will improve the taste and color of the well water at the above mentioned locations is potable and extend the life of pipes and plumbing fixtures. The work includes furnishing and installing reverse osmosis filtrations systems as well as the construction and modification of certain buildings to accommodate these systems and other work as described in the drawings and building specifications. Bids for this project wer...
Indexes: (Inactive) ARNOLD RANDALL, General Superintendent

title

PROPOSED BID RECOMMENDATION

 

 

Department:  Planning and Development

 

Request:  Authorization for the Forest Preserves District of Cook County (the “Preserves”) to enter into a construction contract with GMA Construction Group, Chicago, Illinois to furnish and install water filtration systems at Camp Bullfrog located in Palos Township, Maple Lake Boathouse located in Palos Township, Swallow Cliff Warming Center located in Palos Township, and Camp Shabbona located in Thornton Township.

 

Reason:   16-80-43-R Water Filtration Systems - Rebid. Work undertaken by this contract will improve the taste and color of the well water at the above mentioned locations is potable and extend the life of pipes and plumbing fixtures. The work includes furnishing and installing reverse osmosis filtrations systems as well as the construction and modification of certain buildings to accommodate these systems and other work as described in the drawings and building specifications. Bids for this project were originally to be opened on 6/24/2016 however only one bid was received at that time. According to the Preserves’ purchasing code that bid was not opened and the project was re-issued for bid. Only a single bid received upon re-bid.

 

Bid Opening Date:  7/29/2016 

 

Bid Results:

Firm                                                                                                                                   Total Bid

GMA Construction Group                                                               $671,906.00

 

 

Estimated Fiscal Impact: $671,906.00

 

Contract Period:  Three hundred sixty (360) days after issuance of notice to proceed

 

Account Name/Number:  Building Accounts, 55-6710, 56-6710, 25-6710, 26-6710 and 09-6710 and Camp Accounts 55-6730, 56-6730, 25-6730, 26-6730 and 09-6730

 

District(s): 4 and 17 

 

Concurrence(s):

The vendor has met the Minority and Women Business Enterprise Ordinance provision.

The Chief Attorney and Chief Financial Officer have approved this item.