Title: PROPOSED CONTRACT Department(s): Department of Planning and Development Vendor: Christopher B. Burke Engineering Ltd., Rosemont, Illinois Request: Authorization for the Forest Preserves of Cook County (the “Forest Preserves”) to enter into and execute Good(s) or Service(s): Phase II Engineering Services for 4.8 miles of improvements, including an upgraded Metra rail crossing, a new bridge over Irving Park Road, and boardwalk structure along the Des Plaines River Trail from Irving Park Road to Fullerton Road (known as Segments 5 and 6). Contract Value: $2,882,830.00 ($2,799,938.00 plus $82,892.00 to maximize the grant award) Contract Period: 11/1/2026 – 10/31/2029, with two (2) one-year optional renewals (to be exercised at the discretion of the General Superintendent) Estimated Fiscal Impact: Not to exceed $2,882,830.00. FY 2026 $144,141.50, FY 2027 $1,441,415.00, FY 2028 $864,849.00, FY 2029 $432,424.50 (with up to 90% to be reimbursed by an IDOT grant) Accounts: Profess...
Indexes: ADAM BIANCHI, General Superintendent
Attachments: 1. Location Map, 2. Map DPRT Segments 5-6
Related files: 26-0413
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
PROPOSED CONTRACT

Department(s): Department of Planning and Development

Vendor: Christopher B. Burke Engineering Ltd., Rosemont, Illinois

Request: Authorization for the Forest Preserves of Cook County (the “Forest Preserves”) to enter into and execute

Good(s) or Service(s): Phase II Engineering Services for 4.8 miles of improvements, including an upgraded Metra rail crossing, a new bridge over Irving Park Road, and boardwalk structure along the Des Plaines River Trail from Irving Park Road to Fullerton Road (known as Segments 5 and 6).

Contract Value: $2,882,830.00 ($2,799,938.00 plus $82,892.00 to maximize the grant award)

Contract Period: 11/1/2026 – 10/31/2029, with two (2) one-year optional renewals (to be exercised at the discretion of the General Superintendent)

Estimated Fiscal Impact: Not to exceed $2,882,830.00. FY 2026 $144,141.50, FY 2027 $1,441,415.00, FY 2028 $864,849.00, FY 2029 $432,424.50 (with up to 90% to be reimbursed by an IDOT grant)

Accounts: Professional Services (51009.520830, 51010.520830, 51029.520830, 51033.520830, 51034.520830, 51036.520830, 51037.520830); and future Construction & Development accounts

Contract Number(s): #74000018808 issued in response to RFQ #26-80-014579

Concurrences: The Chief Financial Officer has approved this item. Final contract is subject to legal review and approval.

The contract specific Minority- and Women-Owned Business Enterprise goal for this contract was set to zero.

District(s): 9

Summary: Phase II Engineering Services are required for 4.8 miles of improvements along the Des Plaines River Trail between Irving Park Road and Fullerton Road, known as Segments 5 and 6. The Illinois Department of Transportation (“IDOT”), through the Illinois Transportation Enhancement Program (“ITEP”), awarded a major grant (Board Item No. 240360) that is anticipated to reimburse the Forest Preserves for approximately 90% of the total cost of these services, up to $2,594,547.00.