Legislation Details

File #: 26-0414    Version: 1 Name:
Type: Contract Status: Agenda Ready
File created: 9/15/2026 In control: FPD Board of Commissioners
On agenda: 10/20/2026 Final action:
Title: PROPOSED CONTRACT Department(s): Department of Planning and Development Vendor: Christopher B. Burke Engineering Ltd., Rosemont, Illinois Request: Authorization for the Forest Preserves of Cook County (the “Forest Preserves”) to enter into and execute Good(s) or Service(s): Phase II Engineering Services for 4.8 miles of improvements, including an upgraded Metra rail crossing, a new bridge over Irving Park Road, and boardwalk structure along the Des Plaines River Trail from Irving Park Road to Fullerton Road (known as Segments 5 and 6). Contract Value: $2,882,830.00 ($2,799,938.00 plus $82,892.00 to maximize the grant award) Contract Period: 11/1/2026 – 10/31/2029, with two (2) one-year optional renewals (to be exercised at the discretion of the General Superintendent) Estimated Fiscal Impact: Not to exceed $2,882,830.00. FY 2026 $144,141.50, FY 2027 $1,441,415.00, FY 2028 $864,849.00, FY 2029 $432,424.50 (with up to 90% to be reimbursed by an IDOT grant) Accounts: Profess...
Indexes: ADAM BIANCHI, General Superintendent
Attachments: 1. Location Map, 2. Map DPRT Segments 5-6
Related files: 26-0413
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

PROPOSED CONTRACT

 

Department(s):  Department of Planning and Development

 

Vendor:  Christopher B. Burke Engineering Ltd., Rosemont, Illinois

 

Request: Authorization for the Forest Preserves of Cook County (the “Forest Preserves”) to enter into and execute

 

Good(s) or Service(s): Phase II Engineering Services for 4.8 miles of improvements, including an upgraded Metra rail crossing, a new bridge over Irving Park Road, and boardwalk structure along the Des Plaines River Trail from Irving Park Road to Fullerton Road (known as Segments 5 and 6).

 

Contract Value:  $2,882,830.00 ($2,799,938.00 plus $82,892.00 to maximize the grant award)

 

Contract Period: 11/1/2026 - 10/31/2029, with two (2) one-year optional renewals (to be exercised at the discretion of the General Superintendent)

 

Estimated Fiscal Impact: Not to exceed $2,882,830.00.  FY 2026 $144,141.50, FY 2027 $1,441,415.00, FY 2028 $864,849.00, FY 2029 $432,424.50 (with up to 90% to be reimbursed by an IDOT grant)

 

Accounts: Professional Services (51009.520830, 51010.520830, 51029.520830, 51033.520830, 51034.520830, 51036.520830, 51037.520830); and future Construction & Development accounts

 

Contract Number(s):  #74000018808 issued in response to RFQ #26-80-014579

 

Concurrences: The Chief Financial Officer has approved this item. Final contract is subject to legal review and approval.

 

The contract specific Minority- and Women-Owned Business Enterprise goal for this contract was set to zero.

 

District(s): 9

 

Summary: Phase II Engineering Services are required for 4.8 miles of improvements along the Des Plaines River Trail between Irving Park Road and Fullerton Road, known as Segments 5 and 6. The Illinois Department of Transportation (“IDOT”), through the Illinois Transportation Enhancement Program (“ITEP”), awarded a major grant (Board Item No. 24-0360) that is anticipated to reimburse the Forest Preserves for approximately 90% of the total cost of these services, up to $2,594,547.00.

 

The Forest Preserves issued a Request for Qualifications for Phase II Engineering Services. Six (6) firms responded to a publicly advertised Request for Qualifications. Christopher B. Burke Engineering (“CBBEL”) was selected based on qualifications.

 

In addition to a contract directly with the engineering firm, IDOT requires that the Forest Preserves enter into a Joint Funding Agreement for State Participation and a Local Public Agency Engineering Services Agreement. A Resolution authorizing execution of those agreements has been submitted separately (Board Item No. 26-0413).