Meeting Name: Real Estate Committee Agenda status: Final
Meeting date/time: 7/22/2014 9:15 AM Minutes status: Final  
Meeting location: Cook County Building, Board Room, 118 North Clark Street, Chicago, Illinois
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
14-0170 2 Opposition to Army Corps Stormwater ResolutionResolutionPROPOSED RESOLUTION A Resolution Opposing the United States Army Corps of Engineers Proposed Use of the Fullerton Woods and Harry Semrow Golf Driving Range for Stormwater Management WHEREAS, in August of 2013, the United States Army Corps of Engineers (“U.S. Army Corps”) issued an Integrated Feasibility Report and Environmental Assessment for the Upper Des Plaines River and Tributaries of Illinois and Wisconsin (the “Report”); WHEREAS, the Report sought to create a comprehensive plan for addressing flooding and stormwater along the Des Plaines River; and WHEREAS, the Report proposed a variety of remediation measures along the Des Plaines river, including the creation of a reservoir within the Aptakisic Creek watershed, in Lake County, Illinois, near the Village of Buffalo Grove; and WHEREAS, in October, 2013, the Village of Buffalo Grove passed a resolution opposing the siting of the reservoir at Aptakisic Creek; and WHEREAS, the U.S. Army Corps issued a “Documentation of Changes to the Draft Integrated Feasibility Report and Environmental Assessment” (the “DocumendeferPass Action details Not available
14-0277 1 People’s Gas, Light, and Coke Company (PGL) for Burnham PrairieLicense RequestPROPOSED LICENSE REQUEST Department: Planning and Development Request: Requesting authorization for the Forest Preserve District of Cook County (“the Preserves”), as Licensor to grant a License to People’s Gas, Light, and Coke Company (PGL), Grantee, to locate, operate and maintain a 36-inch natural gas pipeline to replace two existing 24-inch diameter natural gas pipelines in a disturbed portion of Burnham Prairie. The new pipeline segment will enable PGL to run internal electronic inspection equipment through PGL’s line for regular inspection as mandated by Department of Transportation regulations. This pipeline will be the main source of natural gas serving Chicago. The pipeline will be installed by direction bore at a depth of 25 to 30 feet below the surface. No additional excavation or construction activity will take place on FPCC property. No trees will be impacted by this project. PGL has agreed to make an additional contribution of $20,000.00 toward the FPCC’s land restoration activities. Term: Ten (10) Years License Fee: $3,400.00 License Application Fee: approvePass Action details Not available
14-0278 1 Temporary easement to the Illinois Department of Transportation (“IDOT”) at Harts Road and the North Branch of the Chicago RiverEasement RequestEASEMENT REQUEST Department: Planning and Development Request: Requesting authorization for the Forest Preserve District of Cook County (“the Preserves”) to grant a temporary easement to the Illinois Department of Transportation (“IDOT”) at Harts Road and the North Branch of the Chicago River for 0.02 acre or 741 square feet. Reason: IDOT requests a temporary construction easement to access the North Branch of the Chicago River along the north side of Harts Road for a slope stabilization project. The slope stabilization is necessary to ensure the continued operation and safety of the Harts Road Bridge over the river. This remediation will stabilize the river bank and prevent further loss of soil, trees, and vegetation. The slope stabilization will decrease the sediment load in the river, thus reducing surface water degradation and stream siltation. Slope stabilization utilizing a 12-inch tall stone slope mattress over 36-inch tall gabions is to be placed along the banks of the North Branch Chicago River. A synthetic geofilter fabric will be placed on the ground below tapprovePass Action details Not available
14-0285 1 Village of Wheeling, Licensee to locate, operate and maintain a storm sewer connectionLicense RequestPROPOSED LICENSE REQUEST Department: Planning and Development Request: Requesting authorization for the Forest Preserve District of Cook County (“the Preserves”), as Licensor, to grant a License to The Village of Wheeling, Licensee (the “Village”), to locate, operate and maintain a storm sewer connection to an existing storm sewer outfall on Preserves property. The Village intends to extend the existing storm sewer outfall to the river, and re-grade and repair the existing eroded ditch area. The Village also plans to install rip-rap at the outfall to prevent future erosion of the bank at this location. In addition, the Village will provide an access easement to the Preserves to allow access to the narrow strip of Preserves property along the west bank of the river. Term: Continuous License Fee: $3,400.00 License Application Fee: $500.00 YELAR Fee: $3,400.00 Total one-time upfront fee of $7,300.00 for the term of the License (Sec. 5-2A-4 and 5-2B-4) Tree Mitigation Fee: None The area of the License is: 0.028 Acre Concurrence(s): The Chief AttorapprovePass Action details Not available